Food Distribution Warehouse

Tech Electric constructed the electrical, telecommunications and security systems for the expansion of a large Food Distribution Warehouse. The project consisted of 99,000sf addition and the renovation of the existing office space and adjacent warehouse space. The building was occupied and in operation during all phases of construction. We had several diverse/challenging conditions on the job site that included:

  • occupied office areas
  • -10 degrees freezer area
  • 35 degree cooler storage area
  • dry goods storage area
  • 40 foot working heights

UNC Industrial Chiller Plant Renovation

Tech Electric completed work renovating the UNC Hospital Chiller Plant #1 in May, 2007. The project consisted of three 4.160kv Water Cooled Centrifugal Chillers and associated pumps/accessories. This was a very challenging project due to several factors, including the time frame for construction and space constraints. The total project schedule was six and a half months from start to finish, so the building would be ready for the next cooling season. Coordination with the Engineer, General Contractor, Mechanical Contractor and Equipment manufactures was critical in making this project successful. We installed a new medium voltage distribution system, including two – 15kv sectionalizing switches, four -15kv to 4.160kv transformer, two – 15kv to 480v transformers and all the secondary cabling from transformers to the equipment.